[
https://issues.apache.org/jira/browse/ARTEMIS-5696?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated ARTEMIS-5696:
------------------------------------
Labels: pull-request-available (was: )
> Tunneled core large messages can drop some bytes if flow controled at
> specific stages
> -------------------------------------------------------------------------------------
>
> Key: ARTEMIS-5696
> URL: https://issues.apache.org/jira/browse/ARTEMIS-5696
> Project: ActiveMQ Artemis
> Issue Type: Bug
> Components: AMQP
> Affects Versions: 2.42.0
> Reporter: Timothy A. Bish
> Assignee: Timothy A. Bish
> Priority: Major
> Labels: pull-request-available
> Fix For: 2.43.0
>
> Time Spent: 10m
> Remaining Estimate: 0h
>
> If the connection flow control mechanism kicks in during the write process at
> specific stages the writer can drop pending bytes in the frame buffer causing
> a corrupted message arriving on the remote side once the connection starts
> flowing bytes again.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]
For further information, visit: https://activemq.apache.org/contact