[ https://issues.apache.org/jira/browse/AMBARI-15638?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Aravindan Vijayan updated AMBARI-15638: --------------------------------------- Attachment: (was: AMBARI-15638-2.patch) > [AMS] Sum Calculation Incorrect > ------------------------------- > > Key: AMBARI-15638 > URL: https://issues.apache.org/jira/browse/AMBARI-15638 > Project: Ambari > Issue Type: Bug > Reporter: Aravindan Vijayan > Assignee: Aravindan Vijayan > Priority: Blocker > Fix For: 2.2.2 > > Attachments: AMBARI-15638.patch > > > Sum Calculation is incorrect when the time range is more than 2 hrs. > This issue affects all metrics that are queried with the "sum" aggregator > (with or without hostname being specified) for more than a 2hr time-range. -- This message was sent by Atlassian JIRA (v6.3.4#6332)