[
https://issues.apache.org/jira/browse/AMBARI-19152?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15735759#comment-15735759
]
Hadoop QA commented on AMBARI-19152:
------------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12842578/AMBARI-19152.patch
against trunk revision .
{color:red}-1 patch{color}. Top-level trunk compilation may be broken.
Console output:
https://builds.apache.org/job/Ambari-trunk-test-patch/9608//console
This message is automatically generated.
> Perf: UI hangs after click on <Next> button, on <Assign Masters> step
> ---------------------------------------------------------------------
>
> Key: AMBARI-19152
> URL: https://issues.apache.org/jira/browse/AMBARI-19152
> Project: Ambari
> Issue Type: Bug
> Components: ambari-web
> Affects Versions: 2.5.0
> Reporter: Andrii Tkach
> Assignee: Andrii Tkach
> Fix For: 2.5.0
>
> Attachments: AMBARI-19152.patch
>
>
> STR:
> 1) prepare perf cluster on GCE.
> 2) Go through deploy steps to "Assign Masters" step.
> 3) Assign each master to separate host.
> 4) Click "Next" button.
> Not always, but in most of cases UI hangs. One more thing, if you will not
> assign masters to different hosts this issue will not reproduce.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)