[ 
https://issues.apache.org/jira/browse/AMBARI-21432?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16082587#comment-16082587
 ] 

Hudson commented on AMBARI-21432:
---------------------------------

FAILURE: Integrated in Jenkins build Ambari-branch-2.5 #1667 (See 
[https://builds.apache.org/job/Ambari-branch-2.5/1667/])
AMBARI-21432 - Allow Services To Be Stopped During an EU Between Stack 
(jhurley: 
[http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=cea08809ca6144066fb1961873a23061f60bcfd1])
* (edit) 
ambari-server/src/test/python/stacks/2.0.6/HBASE/test_phoenix_queryserver.py
* (edit) 
ambari-server/src/main/resources/stacks/BigInsights/4.2/upgrades/nonrolling-upgrade-to-hdp-2.6.xml
* (edit) ambari-server/src/test/python/stacks/2.0.6/YARN/test_historyserver.py
* (edit) 
ambari-server/src/main/resources/stacks/BigInsights/4.2.5/upgrades/nonrolling-upgrade-to-hdp-2.6.xml
* (edit) 
ambari-common/src/main/python/resource_management/libraries/functions/conf_select.py
* (edit) 
ambari-server/src/main/java/org/apache/ambari/server/state/cluster/ClusterImpl.java


> Allow Services To Be Stopped During an EU Between Stack Vendors
> ---------------------------------------------------------------
>
>                 Key: AMBARI-21432
>                 URL: https://issues.apache.org/jira/browse/AMBARI-21432
>             Project: Ambari
>          Issue Type: Bug
>    Affects Versions: 2.5.2
>            Reporter: Jonathan Hurley
>            Assignee: Jonathan Hurley
>            Priority: Blocker
>             Fix For: 2.5.2
>
>         Attachments: AMBARI-21432.patch
>
>
> With stack features allowed to co-exist for cross stack upgrade, once 
> AMBARI-21430 is completed we should be able to do Stop All services from the 
> upgrade pack.
> This will allow EU to look seamless and similar to any intra-stack upgrade 
> with pre-checks and stop enabled.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to