[ 
https://issues.apache.org/jira/browse/BEAM-6924?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kenneth Knowles resolved BEAM-6924.
-----------------------------------
    Resolution: Fixed

> Prevent overflow when Flink bundle timeout is Long.MAX_VALUE
> ------------------------------------------------------------
>
>                 Key: BEAM-6924
>                 URL: https://issues.apache.org/jira/browse/BEAM-6924
>             Project: Beam
>          Issue Type: Bug
>          Components: runner-flink
>            Reporter: Maximilian Michels
>            Assignee: Maximilian Michels
>            Priority: Minor
>             Fix For: 2.12.0
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> The bundle timeout can overflow and cause strange errors.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to