[ 
https://issues.apache.org/jira/browse/BEAM-6608?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Anonymous updated BEAM-6608:
----------------------------
    Status: Triage Needed  (was: Resolved)

> Flink Runner prepares to-be-staged file too late 
> -------------------------------------------------
>
>                 Key: BEAM-6608
>                 URL: https://issues.apache.org/jira/browse/BEAM-6608
>             Project: Beam
>          Issue Type: Bug
>          Components: runner-flink
>    Affects Versions: 2.10.0
>            Reporter: Maximilian Michels
>            Assignee: Maximilian Michels
>            Priority: P2
>             Fix For: 2.10.0, 2.11.0
>
>          Time Spent: 1h 10m
>  Remaining Estimate: 0h
>
> Before execution, the Flink Runner prepares all necessary files, in order for 
> them to be shipped to the remote cluster.
> Due to a recent regression via BEAM-2873, the preparation is performed after 
> the execution environment has been initialized. This skips the preparation 
> phase and results in invalid files being shipped.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to