[ 
https://issues.apache.org/jira/browse/BEAM-9021?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Kyle Weaver resolved BEAM-9021.
-------------------------------
    Fix Version/s: Not applicable
       Resolution: Duplicate

> Flink portable runner postcommit times out
> ------------------------------------------
>
>                 Key: BEAM-9021
>                 URL: https://issues.apache.org/jira/browse/BEAM-9021
>             Project: Beam
>          Issue Type: Improvement
>          Components: runner-flink, test-failures
>            Reporter: Kyle Weaver
>            Assignee: Kyle Weaver
>            Priority: Major
>              Labels: currently-failing, portability-flink
>             Fix For: Not applicable
>
>
> Build times appear to be inconsistent, with some builds taking 10-30 mins and 
> others timing out at 2 hours.
> https://builds.apache.org/job/beam_PostCommit_PortableJar_Flink/buildTimeTrend



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to