[ 
https://issues.apache.org/jira/browse/DRILL-636?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Aman Sinha updated DRILL-636:
-----------------------------
    Fix Version/s:     (was: Future)
                   1.0.0

> Push Limit operator past project, left outer join, union all operator and 
> down into scan operator 
> --------------------------------------------------------------------------------------------------
>
>                 Key: DRILL-636
>                 URL: https://issues.apache.org/jira/browse/DRILL-636
>             Project: Apache Drill
>          Issue Type: Improvement
>          Components: Query Planning & Optimization
>            Reporter: Jinfeng Ni
>            Assignee: Aman Sinha
>             Fix For: 1.0.0
>
>
> When we have a limit operator on top of project, left outer join, union all 
> operator, we should push the limit operator, until the limit is put into scan 
> operator. Doing so, it will reduce the amount of data scanned by the scan 
> operator.
> For instance,
> Select COL1, COL2 FROM T1 LIMIT 5;
> LIMIT (5)
>  \
> PROJECT (COL1, COL2)
>  \
> SCAN (T1).
> We need push limit past project, down into scan.
> Similar applies to left outer join, or union all.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to