[ https://issues.apache.org/jira/browse/DRILL-2538?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Parth Chandra updated DRILL-2538: --------------------------------- Fix Version/s: (was: 0.9.0) 1.0.0 > Project's setupNewSchema() does not create the correct schema for complex > vectors with children > ----------------------------------------------------------------------------------------------- > > Key: DRILL-2538 > URL: https://issues.apache.org/jira/browse/DRILL-2538 > Project: Apache Drill > Issue Type: Bug > Reporter: Mehant Baid > Assignee: Mehant Baid > Fix For: 1.0.0 > > > While creating the schema for the outgoing batch in project > (setupNewSchema()) we don't create the child vectors for the complex vectors. > We create the children only while performing the transfer in doWork(). This > is ok for most cases, but if we have a blocking operator before project and > our first batch is a schema batch with no records then the transfer would not > create the child vectors and we would propagate half baked schema downstream. -- This message was sent by Atlassian JIRA (v6.3.4#6332)