[ 
https://issues.apache.org/jira/browse/DRILL-2949?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14601377#comment-14601377
 ] 

Aman Sinha commented on DRILL-2949:
-----------------------------------

This has dependency on CALCITE-714 for which I have submitted a patch but it is 
undergoing testing and review.  It is unlikely to be committed for the 1.1.0 
timeframe. 

> TPC-DS queries 1 and 30 fail with CannotPlanException
> -----------------------------------------------------
>
>                 Key: DRILL-2949
>                 URL: https://issues.apache.org/jira/browse/DRILL-2949
>             Project: Apache Drill
>          Issue Type: Bug
>          Components: Query Planning & Optimization
>    Affects Versions: 0.9.0
>            Reporter: Abhishek Girish
>            Assignee: Aman Sinha
>             Fix For: 1.1.0
>
>
> TPC-DS queries 1 & 30 fail on recent master [Regression]:
> {code}
> SYSTEM ERROR: This query cannot be planned possibly due to either a cartesian 
> join or an inequality join 
> {code}
>  



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to