[ 
https://issues.apache.org/jira/browse/FINERACT-1069?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Yemdjih Kaze Nasser reassigned FINERACT-1069:
---------------------------------------------

    Assignee: Yemdjih Kaze Nasser

> RecurringDepositTest / FixedDepositTests failing on 1st of month
> ----------------------------------------------------------------
>
>                 Key: FINERACT-1069
>                 URL: https://issues.apache.org/jira/browse/FINERACT-1069
>             Project: Apache Fineract
>          Issue Type: Bug
>            Reporter: Petri Tuomola
>            Assignee: Yemdjih Kaze Nasser
>            Priority: Major
>
> It seems that the calculation to determine expected interest in 
> RecurringDepositTest / FixedDepositTest breaks on 1st day of (each or some?) 
> months: seems that the logic calculates one day too much interest, and hence 
> the tests fail. This can be reproduced by setting system time to e.g. 1st 
> July and running the tests. This should be fixed as otherwise the builds will 
> always fail on this once a month. 



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to