[
https://issues.apache.org/jira/browse/FLINK-7067?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16096109#comment-16096109
]
Ufuk Celebi commented on FLINK-7067:
------------------------------------
I agree with Stephan's opinion. That's why I also have the test as a separate
commit and corresponding comments in the tests/PR description.
I think for the bugfix release, we have two options:
1) Merge it as is including the test
2) Merge it without the test
Option 3) would be to refactor the tests, but unfortunately I think that
requires refactoring the main line code. Maybe [~StephanEwen] has an idea to do
this or adjust the test without much overhead?
> Cancel with savepoint does not restart checkpoint scheduler on failure
> ----------------------------------------------------------------------
>
> Key: FLINK-7067
> URL: https://issues.apache.org/jira/browse/FLINK-7067
> Project: Flink
> Issue Type: Bug
> Components: State Backends, Checkpointing
> Affects Versions: 1.3.1
> Reporter: Ufuk Celebi
> Assignee: Ufuk Celebi
> Priority: Blocker
> Fix For: 1.3.2
>
>
> The `CancelWithSavepoint` action of the JobManager first stops the checkpoint
> scheduler, then triggers a savepoint, and cancels the job after the savepoint
> completes.
> If the savepoint fails, the command should not have any side effects and we
> don't cancel the job. The issue is that the checkpoint scheduler is not
> restarted though.
--
This message was sent by Atlassian JIRA
(v6.4.14#64029)