[ 
https://issues.apache.org/jira/browse/FLINK-1297?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14580425#comment-14580425
 ] 

ASF GitHub Bot commented on FLINK-1297:
---------------------------------------

Github user fhueske commented on the pull request:

    https://github.com/apache/flink/pull/605#issuecomment-110715816
  
    Hi @tammymendt 
    
    thanks for the update! I'm afraid, we are already in the testing phase for 
the release and don't want to add new features. Since we postponed a few 
important features to the next release, we will push hard to get the next 
release out rather soon.
    
    I'll have a look at the PR in detail after the release stress is over.
    
    Fabian


> Add support for tracking statistics of intermediate results
> -----------------------------------------------------------
>
>                 Key: FLINK-1297
>                 URL: https://issues.apache.org/jira/browse/FLINK-1297
>             Project: Flink
>          Issue Type: Improvement
>          Components: Distributed Runtime
>            Reporter: Alexander Alexandrov
>            Assignee: Alexander Alexandrov
>             Fix For: 0.9
>
>   Original Estimate: 1,008h
>  Remaining Estimate: 1,008h
>
> One of the major problems related to the optimizer at the moment is the lack 
> of proper statistics.
> With the introduction of staged execution, it is possible to instrument the 
> runtime code with a statistics facility that collects the required 
> information for optimizing the next execution stage.
> I would therefore like to contribute code that can be used to gather basic 
> statistics for the (intermediate) result of dataflows (e.g. min, max, count, 
> count distinct) and make them available to the job manager.
> Before I start, I would like to hear some feedback form the other users.
> In particular, to handle skew (e.g. on grouping) it might be good to have 
> some sort of detailed sketch about the key distribution of an intermediate 
> result. I am not sure whether a simple histogram is the most effective way to 
> go. Maybe somebody would propose another lightweight sketch that provides 
> better accuracy.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to