[ 
https://issues.apache.org/jira/browse/FLINK-8986?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16438729#comment-16438729
 ] 

ASF GitHub Bot commented on FLINK-8986:
---------------------------------------

Github user walterddr commented on the issue:

    https://github.com/apache/flink/pull/5849
  
    At this moment it skips 8 of the 39 tests (PATCH & POST methods). And 
there's 2 test failures and I think should be fix in another JIRA. Namely,
    
`/jobs/:jobid/vertices/:vertexid/subtasks/:subtaskid/attempts/attempt/accumulators`
 returns a 500
    `/jobs/:jobid/vertices/:vertexid/subtasks/:subtaskid/attempts/attempt/` 
returns a 500


> End-to-end test: REST
> ---------------------
>
>                 Key: FLINK-8986
>                 URL: https://issues.apache.org/jira/browse/FLINK-8986
>             Project: Flink
>          Issue Type: Sub-task
>          Components: REST, Tests
>            Reporter: Till Rohrmann
>            Assignee: Rong Rong
>            Priority: Major
>
> We should add an end-to-end test which verifies that we can use the REST 
> interface to obtain information about a running job.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to