[ 
https://issues.apache.org/jira/browse/FLINK-15105?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16996978#comment-16996978
 ] 

Yu Li commented on FLINK-15105:
-------------------------------

Another stalling instance observed but on different case 'Resuming Externalized 
Checkpoint (rocks, incremental, scale down) end-to-end test': 
https://api.travis-ci.org/v3/job/625037128/log.txt

> Resuming Externalized Checkpoint after terminal failure (rocks, incremental) 
> end-to-end test stalls on travis
> -------------------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-15105
>                 URL: https://issues.apache.org/jira/browse/FLINK-15105
>             Project: Flink
>          Issue Type: Bug
>          Components: Runtime / Checkpointing
>    Affects Versions: 1.10.0
>            Reporter: Yu Li
>            Priority: Critical
>              Labels: test-stability
>             Fix For: 1.10.0
>
>
> Resuming Externalized Checkpoint after terminal failure (rocks, incremental) 
> end-to-end test fails on release-1.9 nightly build stalls with "The job 
> exceeded the maximum log length, and has been terminated".
> https://api.travis-ci.org/v3/job/621090394/log.txt



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to