[
https://issues.apache.org/jira/browse/FLINK-20439?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Zhu Zhu closed FLINK-20439.
---------------------------
Resolution: Done
Done via
2c6521a0a62ba302cd821f1fecb12191e6e913e7
1aa9074e8a14765825f56e84caca806d4c17e227
> Simplifying scheduleOrUpdateConsumers
> -------------------------------------
>
> Key: FLINK-20439
> URL: https://issues.apache.org/jira/browse/FLINK-20439
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination
> Reporter: Zhu Zhu
> Assignee: Zhu Zhu
> Priority: Major
> Labels: pull-request-available
> Fix For: 1.13.0
>
>
> JobMaster#scheduleOrUpdateConsumers() was used to schedule a vertex when its
> PIPELINED inputs have data produced.
> It is not needed anymore in the latest pipelined region scheduling because
> PIPELINED upstream and downstream tasks will be scheduled all at once.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)