[
https://issues.apache.org/jira/browse/FLINK-21399?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Chesnay Schepler reassigned FLINK-21399:
----------------------------------------
Assignee: Chesnay Schepler
> Adjust JobMasterTest#testRequestNextInputSplitWith*Failover
> -----------------------------------------------------------
>
> Key: FLINK-21399
> URL: https://issues.apache.org/jira/browse/FLINK-21399
> Project: Flink
> Issue Type: Sub-task
> Components: Runtime / Coordination, Tests
> Reporter: Chesnay Schepler
> Assignee: Chesnay Schepler
> Priority: Major
> Fix For: 1.13.0
>
>
> The testRequestNextInputSplitWithLocalFailover and
> testRequestNextInputSplitWithGlobalFailover tests fail because they request
> input splits right after starting the JobMaster, assuming splits to already
> be queryable.
> The test should ensure that the job can actually be deployed, because only at
> that point would splits be requested in production, and there is no practical
> need for splits to exist earlier than that.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)