[
https://issues.apache.org/jira/browse/FLINK-8041?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17321619#comment-17321619
]
Flink Jira Bot commented on FLINK-8041:
---------------------------------------
This issue and all of its Sub-Tasks have not been updated for 180 days. So, it
has been labeled "stale-minor". If you are still affected by this bug or are
still interested in this issue, please give an update and remove the label. In
7 days the issue will be closed automatically.
> Recommended Improvements for Gelly's Connected Components Algorithm
> -------------------------------------------------------------------
>
> Key: FLINK-8041
> URL: https://issues.apache.org/jira/browse/FLINK-8041
> Project: Flink
> Issue Type: Improvement
> Components: Library / Graph Processing (Gelly)
> Affects Versions: 1.3.2
> Environment: Linux, IntelliJ IDEA
> Reporter: Christos Hadjinikolis
> Priority: Minor
> Labels: stale-minor
> Original Estimate: 336h
> Remaining Estimate: 336h
>
> At the moment, the ConnectedComponents algorithm that comes with Flink's
> native Graph API (Gelly) has two issues:
> 1. It relies on the user to provide correct values for in the vertices
> DataSet. Based on how the algorithm works, these values must be of type Long
> and be unique for every vertex. If the user provides the same values for
> every vertex (e.g. 1) the algorithm still works but as those values are used
> for the identification of the different connected components, one will end up
> with a single connected component and will have no clue as to why this
> happened. This can be easily fixed in two ways: either by checking that the
> values that appear alongside vertex-ids are unique and informing the user if
> not, or by generating those values for every vertex before the algorithm is
> ran. I have a running implementation of the second way and I really think it
> is an appropriate solution to this problem.
> 2. Once the connected components are identified, one has to apply additional
> transformations and actions to find out which is the biggest or the order of
> the connected components in terms of their size. Alternatively, the algorithm
> can be implemented so that numerical ids that are given to each component
> reflect their ranking when ordered based on size, e.g. connected component 1
> will be the biggest, connected component 2 should be the second biggest and
> so on. I have also solved this and I think it would make a nice addition.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)