[ 
https://issues.apache.org/jira/browse/FLINK-33276?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Matthias Pohl resolved FLINK-33276.
-----------------------------------
    Fix Version/s: 1.19.0
                   1.18.1
       Resolution: Fixed

> Reorganize CI stages
> --------------------
>
>                 Key: FLINK-33276
>                 URL: https://issues.apache.org/jira/browse/FLINK-33276
>             Project: Flink
>          Issue Type: Technical Debt
>          Components: Build System / CI
>    Affects Versions: 1.18.0, 1.19.0
>            Reporter: Matthias Pohl
>            Assignee: Matthias Pohl
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 1.19.0, 1.18.1
>
>
> {{connect_2}} stage became obsolete due to the externalization of the 
> connectors. We can merge {{connect_1}} and {{connect_2}} again into a single 
> {{connect}} stage (and maybe rename it into something more meaningful?)



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to