[ 
https://issues.apache.org/jira/browse/FLINK-35552?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Matthias Pohl reassigned FLINK-35552:
-------------------------------------

    Assignee: Matthias Pohl

> Move CheckpointStatsTracker out of ExecutionGraph into Scheduler
> ----------------------------------------------------------------
>
>                 Key: FLINK-35552
>                 URL: https://issues.apache.org/jira/browse/FLINK-35552
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Checkpointing, Runtime / Coordination
>            Reporter: Matthias Pohl
>            Assignee: Matthias Pohl
>            Priority: Major
>              Labels: pull-request-available
>
> The scheduler needs to know about the CheckpointStatsTracker to allow 
> listening to checkpoint failures and completion.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to