https://issues.apache.org/jira/browse/FLINK-40482?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

ASF GitHub Bot updated FLINK-40482:
-----------------------------------
    Labels: pull-request-available  (was: )

> DefaultCheckpointPlanCalculator misclassifies FAILED/CANCELED tasks as 
> finished
> -------------------------------------------------------------------------------
>
>                 Key: FLINK-40482
>                 URL: https://issues.apache.org/jira/browse/FLINK-40482
>             Project: Flink
>          Issue Type: Bug
>          Components: Runtime / Checkpointing
>            Reporter: Rui Fan
>            Assignee: Rui Fan
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 2.4.0
>
>
> h3. Problem
> DefaultCheckpointPlanCalculator uses Execution.isFinished() (which returns
> state.isTerminal()) to decide whether a task is finished. This treats any
> terminal task — FINISHED, FAILED, or CANCELED — as finished.
> When a failover is in progress, some tasks may be FAILED/CANCELED. The
> calculator then classifies them as finished and excludes them from
> tasksToWaitFor, producing a checkpoint plan that expects fewer acks than
> it should (in the extreme, an empty plan).
> Today PendingCheckpoint rejects an empty tasksToWaitFor, so the worst case
> is masked. But the classification is wrong at its source: "terminal" is not
> the same as "finished", and relying on the downstream guard leaves the issue
> latent.
> h3. Fix
> - Classify explicitly in collectTaskRunningStatus: a non-terminal task is
>   running; a terminal task must be genuinely FINISHED.
> - Abort the checkpoint with a graceful CheckpointException when a task is
>   FAILED/CANCELED (i.e. a failover is underway) instead of building a plan
>   from a transient state.
> - Remove the misleading Execution.isFinished() (its only caller).
> This is condition-based, not mode-based, so it is correct for both streaming
> and batch. calculateCheckpointPlan and all task state transitions run on the
> JM main thread, so the pre-check and plan computation are atomic.



--
This message was sent by Atlassian Jira