[
https://issues.apache.org/jira/browse/GEODE-9662?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17470158#comment-17470158
]
Geode Integration commented on GEODE-9662:
------------------------------------------
Seen in [acceptance-test-openjdk8
#73|https://concourse.apachegeode-ci.info/teams/main/pipelines/apache-develop-main/jobs/acceptance-test-openjdk8/builds/73]
... see [test
results|http://files.apachegeode-ci.info/builds/apache-develop-main/1.15.0-build.0761/test-results/acceptanceTest/1641418890/]
or download
[artifacts|http://files.apachegeode-ci.info/builds/apache-develop-main/1.15.0-build.0761/test-artifacts/1641418890/acceptancetestfiles-openjdk8-1.15.0-build.0761.tgz].
> CI Failure: acceptance-test-openjdk8 timed out
> ----------------------------------------------
>
> Key: GEODE-9662
> URL: https://issues.apache.org/jira/browse/GEODE-9662
> Project: Geode
> Issue Type: Bug
> Components: tests
> Reporter: Darrel Schneider
> Assignee: Owen Nichols
> Priority: Major
> Labels: flaky-test, pull-request-available
> Fix For: 1.15.0
>
>
> this run of acceptance-test-openjdk8 timed out with a total duration of 3h5m.
> The next one passed with a total duration of 3h1m. Is it possible that we
> need to extend how much time we give acceptance tests to run?
> https://concourse.apachegeode-ci.info/teams/main/pipelines/apache-develop-main/jobs/acceptance-test-openjdk8/builds/229
--
This message was sent by Atlassian Jira
(v8.20.1#820001)