[ https://issues.apache.org/jira/browse/HBASE-11004?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Nick Dimiduk updated HBASE-11004: --------------------------------- Fix Version/s: 0.99.0 > Extend traces through FSHLog#sync > --------------------------------- > > Key: HBASE-11004 > URL: https://issues.apache.org/jira/browse/HBASE-11004 > Project: HBase > Issue Type: Improvement > Components: wal > Reporter: Nick Dimiduk > Assignee: Nick Dimiduk > Fix For: 0.99.0 > > Attachments: HBASE-11004.00.patch, HBASE-11004.01.patch, > HBASE-11004.02.patch, HBASE-11004.03.patch, spans.png, spans.txt > > > Changes introduced in HBASE-8755 decouple wal append from wal sync. A gap was > left in the tracing of these requests. I believe this means are spans are > decoupled from the work happening over on HDFS-5274. This ticket is to close > the air-gap between threads. -- This message was sent by Atlassian JIRA (v6.2#6252)