[
https://issues.apache.org/jira/browse/HBASE-12549?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Enis Soztutar updated HBASE-12549:
----------------------------------
Attachment: hbase-12549_v1.patch
Simple fix. The test runs around 3 sec now.
> Fix TestAssignmentManagerOnCluster#testAssignRacingWithSSH() flaky test
> -----------------------------------------------------------------------
>
> Key: HBASE-12549
> URL: https://issues.apache.org/jira/browse/HBASE-12549
> Project: HBase
> Issue Type: Test
> Reporter: Enis Soztutar
> Assignee: Enis Soztutar
> Fix For: 2.0.0, 0.98.9, 0.99.2
>
> Attachments: hbase-12549_v1.patch
>
>
> TestAssignmentManagerOnCluster#testAssignRacingWithSSH() runs on average 40
> sec, with 60 sec timeout. This causes flakiness.
> The fix is easy. One of the earlier tests increases the
> hbase.assignment.maximum.attempts from 3 to 10. Then
> testAssignRacingWithSSH() is ran with 10 attempts causing slowness.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)