[ 
https://issues.apache.org/jira/browse/HBASE-13041?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andrey Stepachev updated HBASE-13041:
-------------------------------------
    Attachment: HBASE-13041.patch

> TestEnableTableHandler should not call AssignmentManager#assign concurrently 
> with master
> ----------------------------------------------------------------------------------------
>
>                 Key: HBASE-13041
>                 URL: https://issues.apache.org/jira/browse/HBASE-13041
>             Project: HBase
>          Issue Type: Bug
>          Components: integration tests
>    Affects Versions: 2.0.0
>            Reporter: Andrey Stepachev
>            Assignee: Andrey Stepachev
>         Attachments: HBASE-13041.patch
>
>
> TestEnableTableHandler calls assign() concurrently with master. Lets call 
> assign through admin interface.
> Also make asserts a bit more stable.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to