[ https://issues.apache.org/jira/browse/HBASE-13182?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14353802#comment-14353802 ]
Srikanth Srungarapu commented on HBASE-13182: --------------------------------------------- +1(non-binding). > Test NamespaceAuditor/AccessController create/delete table is flaky > ------------------------------------------------------------------- > > Key: HBASE-13182 > URL: https://issues.apache.org/jira/browse/HBASE-13182 > Project: HBase > Issue Type: Test > Components: test > Reporter: Matteo Bertozzi > Assignee: Matteo Bertozzi > Priority: Minor > Attachments: HBASE-13182-v0.patch > > > Similar to HBASE-13179 > TestNamespaceAuditor and the two test AccessController fail when create or > delete table takes more time.and it is because the sync version of the Admin > operation is not sync, but relies on the last operation on the server e.g. > delete meta. > but the post-operation method of the coprocessor is called after meta is > deleted.. > long story short, the client is not really sync and it will be fixed by > HBASE-12439. > similar to what we do in TestMasterObserver we can add an observer with a > countDownLatch to wait the postOpHandler call. -- This message was sent by Atlassian JIRA (v6.3.4#6332)