[ https://issues.apache.org/jira/browse/HBASE-14712?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Matteo Bertozzi updated HBASE-14712: ------------------------------------ Attachment: (was: HBASE-14712-v1.patch) > MasterProcWALs never clean up > ----------------------------- > > Key: HBASE-14712 > URL: https://issues.apache.org/jira/browse/HBASE-14712 > Project: HBase > Issue Type: Bug > Reporter: Elliott Clark > Assignee: Matteo Bertozzi > Priority: Blocker > Fix For: 2.0.0, 1.2.0, 1.3.0, 1.1.3 > > Attachments: HBASE-14712-v0.patch, HBASE-14712-v1.patch, state.tar.gz > > > MasterProcWALs directory grows pretty much un-bounded. Because of that when > master failover happens the NN is flooded with connections and everything > grinds to a halt. -- This message was sent by Atlassian JIRA (v6.3.4#6332)