[ 
https://issues.apache.org/jira/browse/HBASE-15584?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15310758#comment-15310758
 ] 

Ted Yu commented on HBASE-15584:
--------------------------------

Suppose the procID / backupID mapping is written in the hbase:backup table 
first, after that RPC call returns to the client.
This would endure the loss of RPC, right ?

> Revisit handling of BackupState#CANCELLED
> -----------------------------------------
>
>                 Key: HBASE-15584
>                 URL: https://issues.apache.org/jira/browse/HBASE-15584
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Ted Yu
>            Priority: Minor
>
> During review of HBASE-15411, Enis made the following point:
> {code}
> nobody puts the backup in cancelled state. setCancelled() is not used. So if 
> I abort a backup, who writes to the system table the new state? 
> Not sure whether this is a phase 1 patch issue or due to this patch. We can 
> open a new jira and address it there if you do not want to do it in this 
> patch. 
> Also maybe this should be named ABORTED rather than CANCELLED.
> {code}
> This issue is to decide whether this state should be kept (e.g. through 
> notification from procedure V2 framework in response to abortion).
> If it is to be kept, the state should be renamed ABORTED.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to