[ 
https://issues.apache.org/jira/browse/HBASE-14123?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15682036#comment-15682036
 ] 

Vladimir Rodionov edited comment on HBASE-14123 at 11/20/16 11:39 PM:
----------------------------------------------------------------------

{quote}
Why when I run an incremental backup, I get summary from the 
FullTableBackupClient? I'd think I'd get report from the incremental version. 
I'd also expect a summary of what was in the incremental?
{quote}

First phase of an incremental restore is a full backup restore, that is why you 
see logging from FullTableBackupClient.

{quote}
After reading the user doc., I am unclear on how to restore from a full backup 
and two incrementals. I have to manually apply these in order manually? Is 
there a way to ask the tool to do this for me?
{quote}

HBASE-17133 will address this question.


was (Author: vrodionov):
{quote}
Why when I run an incremental backup, I get summary from the 
FullTableBackupClient? I'd think I'd get report from the incremental version. 
I'd also expect a summary of what was in the incremental?
{quote}

First phase of an incremental restore is a full backup restore, that is why you 
see logging from FullTableBackupClient.

> HBase Backup/Restore Phase 2
> ----------------------------
>
>                 Key: HBASE-14123
>                 URL: https://issues.apache.org/jira/browse/HBASE-14123
>             Project: HBase
>          Issue Type: Umbrella
>            Reporter: Vladimir Rodionov
>            Assignee: Vladimir Rodionov
>            Priority: Blocker
>             Fix For: 2.0.0
>
>         Attachments: 14123-master.v14.txt, 14123-master.v15.txt, 
> 14123-master.v16.txt, 14123-master.v17.txt, 14123-master.v18.txt, 
> 14123-master.v19.txt, 14123-master.v2.txt, 14123-master.v20.txt, 
> 14123-master.v21.txt, 14123-master.v24.txt, 14123-master.v25.txt, 
> 14123-master.v27.txt, 14123-master.v28.txt, 14123-master.v29.full.txt, 
> 14123-master.v3.txt, 14123-master.v30.txt, 14123-master.v31.txt, 
> 14123-master.v32.txt, 14123-master.v33.txt, 14123-master.v34.txt, 
> 14123-master.v35.txt, 14123-master.v36.txt, 14123-master.v37.txt, 
> 14123-master.v38.txt, 14123-master.v5.txt, 14123-master.v6.txt, 
> 14123-master.v7.txt, 14123-master.v8.txt, 14123-master.v9.txt, 14123-v14.txt, 
> HBASE-14123-for-7912-v1.patch, HBASE-14123-for-7912-v6.patch, 
> HBASE-14123-v1.patch, HBASE-14123-v10.patch, HBASE-14123-v11.patch, 
> HBASE-14123-v12.patch, HBASE-14123-v13.patch, HBASE-14123-v15.patch, 
> HBASE-14123-v16.patch, HBASE-14123-v2.patch, HBASE-14123-v3.patch, 
> HBASE-14123-v4.patch, HBASE-14123-v5.patch, HBASE-14123-v6.patch, 
> HBASE-14123-v7.patch, HBASE-14123-v9.patch
>
>
> Phase 2 umbrella JIRA. See HBASE-7912 for design document and description. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to