[ 
https://issues.apache.org/jira/browse/HBASE-19226?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16249082#comment-16249082
 ] 

Yun Zhao commented on HBASE-19226:
----------------------------------

The number of regions in the same table also changes, and the reduce tasks 
number also needs to be dynamically adjusted.
0.005 a bit too small, generally should be in the range of 0.1 to 1.
Add a specified number is ok, but how to judge with ratio :(  [~reidchan]
 

> Limit the reduce tasks number of incremental load
> -------------------------------------------------
>
>                 Key: HBASE-19226
>                 URL: https://issues.apache.org/jira/browse/HBASE-19226
>             Project: HBase
>          Issue Type: Improvement
>            Reporter: Yun Zhao
>            Assignee: Yun Zhao
>            Priority: Minor
>         Attachments: HBASE-19226.master.001.patch, 
> HBASE-19226.master.002.patch
>
>
> When using MapReduce job to perform an incremental load into a table,the 
> number of reduce tasks is the current number of regions. If there are too 
> many regions, will lead to network+disk I/O is too large, affecting the 
> real-time request.
> Need to use a configuration to set a number or ratio?
> Limit running reduce tasks since 
> [https://issues.apache.org/jira/browse/MAPREDUCE-5583], the old version can 
> only be set reduce number.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to