[ 
https://issues.apache.org/jira/browse/HBASE-19758?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

stack updated HBASE-19758:
--------------------------
       Resolution: Fixed
     Hadoop Flags: Reviewed
    Fix Version/s: 2.0.0-beta-1
           Status: Resolved  (was: Patch Available)

Pushed this nice refactoring to branch-2 and master.

> Split TestHCM to several smaller tests
> --------------------------------------
>
>                 Key: HBASE-19758
>                 URL: https://issues.apache.org/jira/browse/HBASE-19758
>             Project: HBase
>          Issue Type: Improvement
>          Components: test
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>             Fix For: 2.0.0-beta-1
>
>         Attachments: HBASE-19758.patch, HBASE-19758.patch
>
>
> It takes too much time to finish, especially the timeout related tests. We 
> should move these tests out.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to