[
https://issues.apache.org/jira/browse/HBASE-18828?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16428573#comment-16428573
]
stack commented on HBASE-18828:
-------------------------------
Thanks for the help. I made the graph last night, was impressed by the
spaghetti then went to bed saving pleasure of deciphering for this morning. You
view saved me some head-scratching. Thanks.
bq. would be better to use master instead of branch-2 I think....
What command you running?
Currently I'm thinking I need to figure what is in hbase1 that is also in
hbase2 and remove 2.0.0 from JIRA for those commits. You suggesting otherwise?
> [2.0] Generate CHANGES.txt
> --------------------------
>
> Key: HBASE-18828
> URL: https://issues.apache.org/jira/browse/HBASE-18828
> Project: HBase
> Issue Type: Sub-task
> Reporter: stack
> Assignee: stack
> Priority: Blocker
> Fix For: 2.0.0
>
> Attachments: changelog.md, hbase_branches.svg, releasenotes.md
>
>
> See [~busbey] writeup on generating CHANGES.txt here HBASE-14025 (fold it
> into refguide while at it..)
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)