[ 
https://issues.apache.org/jira/browse/HBASE-20808?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang updated HBASE-20808:
------------------------------
    Fix Version/s:     (was: 2.1.0)
                   2.1.1

> Wrong shutdown order between Chores and ChoreService
> ----------------------------------------------------
>
>                 Key: HBASE-20808
>                 URL: https://issues.apache.org/jira/browse/HBASE-20808
>             Project: HBase
>          Issue Type: Bug
>            Reporter: Reid Chan
>            Assignee: Nihal Jain
>            Priority: Minor
>              Labels: beginner
>             Fix For: 3.0.0, 1.5.0, 1.4.6, 2.0.2, 2.1.1
>
>         Attachments: HBASE-20808.branch-1.001.patch, 
> HBASE-20808.master.001.patch, HBASE-20808.master.002.patch, 
> HBASE-20808.master.003.patch, HBASE-20808.master.004.patch
>
>
> When stopping master, {{ChoreService}}, which serves all the chores, is 
> stopped before canceling all running chores.
> It should cancel all running chores, then shutdown {{ChoreService}}.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to