[ https://issues.apache.org/jira/browse/HBASE-20881?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Duo Zhang updated HBASE-20881: ------------------------------ Fix Version/s: 2.2.0 3.0.0 Status: Patch Available (was: Open) > Introduce a region transition procedure to handle all the state transition > for a region > --------------------------------------------------------------------------------------- > > Key: HBASE-20881 > URL: https://issues.apache.org/jira/browse/HBASE-20881 > Project: HBase > Issue Type: Sub-task > Reporter: Duo Zhang > Assignee: Duo Zhang > Priority: Major > Fix For: 3.0.0, 2.2.0 > > Attachments: HBASE-20881.patch > > > Now have an AssignProcedure, an UnssignProcedure, and also a > MoveRegionProcedure which schedules an AssignProcedure and an > UnssignProcedure to move a region. This makes the logic a bit complicated, as > MRP is not a RIT, so when SCP can not interrupt it directly... -- This message was sent by Atlassian JIRA (v7.6.3#76005)