[
https://issues.apache.org/jira/browse/HBASE-21376?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16665144#comment-16665144
]
stack commented on HBASE-21376:
-------------------------------
Pushed on branch-2.1 and branch-2.0. Didn't spend time on figuring why it
doesn't apply to branch-2. Leaving open in case you want to put a patch up for
branch-2 [~allan163].
> Add some verbose log to MasterProcedureScheduler
> ------------------------------------------------
>
> Key: HBASE-21376
> URL: https://issues.apache.org/jira/browse/HBASE-21376
> Project: HBase
> Issue Type: Sub-task
> Reporter: Allan Yang
> Assignee: Allan Yang
> Priority: Major
> Fix For: 2.1.1, 2.0.3
>
> Attachments: HBASE-21376.branch-2.0.001.patch
>
>
> As discussed in HBASE-21364, we divided the patch in HBASE-21364 to two, the
> critical one is already submitted in HBASE-21364 to branch-2.0 and
> branch-2.1, but I also added some useful logs which need to commit to all
> branches.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)