[ https://issues.apache.org/jira/browse/HBASE-21376?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Duo Zhang updated HBASE-21376: ------------------------------ Status: Patch Available (was: Reopened) Add debug log directly. > Add some verbose log to MasterProcedureScheduler > ------------------------------------------------ > > Key: HBASE-21376 > URL: https://issues.apache.org/jira/browse/HBASE-21376 > Project: HBase > Issue Type: Sub-task > Reporter: Allan Yang > Assignee: Allan Yang > Priority: Major > Fix For: 2.0.3, 2.1.2 > > Attachments: HBASE-21376.branch-2.0.001.patch, > HBASE-21376.branch-2.0.001.patch, HBASE-21376.patch > > > As discussed in HBASE-21364, we divided the patch in HBASE-21364 to two, the > critical one is already submitted in HBASE-21364 to branch-2.0 and > branch-2.1, but I also added some useful logs which need to commit to all > branches. -- This message was sent by Atlassian JIRA (v7.6.3#76005)