[
https://issues.apache.org/jira/browse/HBASE-21666?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16752635#comment-16752635
]
stack commented on HBASE-21666:
-------------------------------
bq. I tested it on master branch, do you guys see this is also a problem in
branch-2?
Yes
bq. I'm wondered if you have any concern if I break them in to separate classes
per test and refactor the common part into a base class?
Makes sense if each method takes a bit of time to run.
> Break up the TestExportSnapshot UTs; they can timeout
> -----------------------------------------------------
>
> Key: HBASE-21666
> URL: https://issues.apache.org/jira/browse/HBASE-21666
> Project: HBase
> Issue Type: Bug
> Components: test
> Reporter: stack
> Assignee: Tak Lon (Stephen) Wu
> Priority: Major
> Labels: beginner
>
> These timed out for [~Apache9] when he ran with the -PrunAllTests. Suggests
> breaking them up into smaller tests so less likely they'll timeout.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)