[ 
https://issues.apache.org/jira/browse/HBASE-21666?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16752635#comment-16752635
 ] 

stack commented on HBASE-21666:
-------------------------------

bq. I tested it on master branch, do you guys see this is also a problem in 
branch-2?

Yes

bq. I'm wondered if you have any concern if I break them in to separate classes 
per test and refactor the common part into a base class?

Makes sense if each method takes a bit of time to run.

> Break up the TestExportSnapshot UTs; they can timeout
> -----------------------------------------------------
>
>                 Key: HBASE-21666
>                 URL: https://issues.apache.org/jira/browse/HBASE-21666
>             Project: HBase
>          Issue Type: Bug
>          Components: test
>            Reporter: stack
>            Assignee: Tak Lon (Stephen) Wu
>            Priority: Major
>              Labels: beginner
>
> These timed out for [~Apache9] when he ran with the -PrunAllTests. Suggests 
> breaking them up into smaller tests so less likely they'll timeout.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to