[ 
https://issues.apache.org/jira/browse/HBASE-5751?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13257224#comment-13257224
 ] 

Gregory Chanan commented on HBASE-5751:
---------------------------------------

It looks like it failed 4 times in a row after the commit, and it has currently 
failed 3 times in a row [see 471-473].  The current failure string is long 
after the revert (see below).  Perhaps we should open an issue to figure out 
the failure?  I'm fine with HBASE-5213 not going into 0.90 until after that is 
figured out.

commit b05142a79fb3b461081d20c4da3592ed59a956b9
Author: Jonathan Hsieh <jmhs...@apache.org>
Date:   Fri Apr 6 16:35:26 2012 +0000

    Revert 'HBASE-5213 "hbase master stop" does not bring down backup masters' 
due to hanging TestLogRolling
    
    
    git-svn-id: https://svn.apache.org/repos/asf/hbase/branches/0.90@1310456 
13f79535-47bb-0310-9956-ffa450edef68



                
> "hbase master stop" does not bring down backup masters
> ------------------------------------------------------
>
>                 Key: HBASE-5751
>                 URL: https://issues.apache.org/jira/browse/HBASE-5751
>             Project: HBase
>          Issue Type: Sub-task
>            Reporter: Lars Hofhansl
>            Assignee: Gregory Chanan
>             Fix For: 0.90.7
>
>
> Carry forward the discussion from parent for 0.90

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators: 
https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to