[ 
https://issues.apache.org/jira/browse/HBASE-6725?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Andrew Kyle Purtell closed HBASE-6725.
--------------------------------------

> Check and Put can fail when using locks
> ---------------------------------------
>
>                 Key: HBASE-6725
>                 URL: https://issues.apache.org/jira/browse/HBASE-6725
>             Project: HBase
>          Issue Type: Bug
>          Components: master
>    Affects Versions: 0.90.4
>         Environment: tested on mac os x
>            Reporter: Nicolas ThiƩbaud
>            Priority: Major
>         Attachments: CAPwithLocks.zip, TestCase_HBASE_6725.patch
>
>
> When multiple threads race using CAP with and a lock on the same row, several 
> instances may be allowed to update the cell with the new value (although the 
> expected value is different).
> If all threads race with a wrong expected value and a lock, none will be able 
> to update.



--
This message was sent by Atlassian Jira
(v8.20.7#820007)

Reply via email to