[ 
https://issues.apache.org/jira/browse/HBASE-7824?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13593237#comment-13593237
 ] 

Hudson commented on HBASE-7824:
-------------------------------

Integrated in HBase-0.94-security #116 (See 
[https://builds.apache.org/job/HBase-0.94-security/116/])
    HBASE-7824 Revert until TestMasterFailover passes reliably (Revision 
1452452)

     Result = SUCCESS
tedyu : 
Files : 
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/catalog/CatalogTracker.java
* /hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/master/HMaster.java
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/master/MasterFileSystem.java
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/master/ServerManager.java
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/master/handler/ServerShutdownHandler.java
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/regionserver/HRegionServer.java
* 
/hbase/branches/0.94/src/main/java/org/apache/hadoop/hbase/zookeeper/ZooKeeperNodeTracker.java
* 
/hbase/branches/0.94/src/test/java/org/apache/hadoop/hbase/master/TestDistributedLogSplitting.java
* 
/hbase/branches/0.94/src/test/java/org/apache/hadoop/hbase/regionserver/TestRSKilledWhenMasterInitializing.java

                
> Improve master start up time when there is log splitting work
> -------------------------------------------------------------
>
>                 Key: HBASE-7824
>                 URL: https://issues.apache.org/jira/browse/HBASE-7824
>             Project: HBase
>          Issue Type: Bug
>          Components: master
>            Reporter: Jeffrey Zhong
>            Assignee: Jeffrey Zhong
>             Fix For: 0.94.7
>
>         Attachments: HBASE-7824_3.patch, hbase-7824.patch, hbase-7824_v2.patch
>
>
> When there is log split work going on, master start up waits till all log 
> split work completes even though the log split has nothing to do with meta 
> region servers.
> It's a bad behavior considering a master node can run when log split is 
> happening while its start up is blocking by log split work. 
> Since master is kind of single point of failure, we should start it ASAP.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Reply via email to