[ 
https://issues.apache.org/jira/browse/HIVE-19508?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16499384#comment-16499384
 ] 

Hive QA commented on HIVE-19508:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12925959/HIVE-19508.2.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 14429 tests 
executed
*Failed tests:*
{noformat}
TestMiniTezCliDriver - did not produce a TEST-*.xml file (likely timed out) 
(batchId=106)
        
[update_orig_table.q,explainanalyze_3.q,orc_vectorization_ppd.q,vector_non_string_partition.q,multi_count_distinct.q,explainanalyze_1.q,explainuser_3.q,explainanalyze_4.q,hybridgrace_hashjoin_1.q,delete_orig_table.q,hybridgrace_hashjoin_2.q,tez-tag.q,orc_merge12.q,explainanalyze_5.q,vector_join_part_col_char.q]
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/11471/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/11471/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-11471/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12925959 - PreCommit-HIVE-Build

> SparkJobMonitor getReport doesn't print stage progress in order
> ---------------------------------------------------------------
>
>                 Key: HIVE-19508
>                 URL: https://issues.apache.org/jira/browse/HIVE-19508
>             Project: Hive
>          Issue Type: Sub-task
>          Components: Spark
>            Reporter: Sahil Takiar
>            Assignee: Bharathkrishna Guruvayoor Murali
>            Priority: Major
>         Attachments: HIVE-19508.1.patch, HIVE-19508.2.patch
>
>
> You can end up with a progress output like this:
> {code}
> Stage-10_0: 0/29      Stage-11_0: 0/44        Stage-12_0: 0/11        
> Stage-13_0: 0/1 Stage-8_0: 258(+76)/468 Stage-9_0: 0/165
> {code}



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to