[ 
https://issues.apache.org/jira/browse/HIVE-19505?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Vihang Karajgaonkar updated HIVE-19505:
---------------------------------------
    Summary: Increase number of parallel runs from 2 per node to 3  (was: 
Increase number of parallel runs from 2 per node to 4)

> Increase number of parallel runs from 2 per node to 3
> -----------------------------------------------------
>
>                 Key: HIVE-19505
>                 URL: https://issues.apache.org/jira/browse/HIVE-19505
>             Project: Hive
>          Issue Type: Sub-task
>            Reporter: Vihang Karajgaonkar
>            Assignee: Vihang Karajgaonkar
>            Priority: Major
>
> The test cluster is under utilized. For the short run we can increase the 
> parallel threads from 2 to 3 (or may be 4) which will speedup parallel test 
> batches.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to