[ 
https://issues.apache.org/jira/browse/HIVE-20120?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16548366#comment-16548366
 ] 

Hive QA commented on HIVE-20120:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12932067/HIVE-20120.01.patch

{color:red}ERROR:{color} -1 due to no test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 14662 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/12673/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/12673/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-12673/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12932067 - PreCommit-HIVE-Build

> Hive incremental load dag genetration causing OOM error
> -------------------------------------------------------
>
>                 Key: HIVE-20120
>                 URL: https://issues.apache.org/jira/browse/HIVE-20120
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 4.0.0
>
>         Attachments: HIVE-20120.01.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create 
> number of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to