[ 
https://issues.apache.org/jira/browse/HIVE-20491?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16602318#comment-16602318
 ] 

Hive QA commented on HIVE-20491:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12938137/HIVE-20491.01.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 3 failed/errored test(s), 14922 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[bucket_map_join_tez2]
 (batchId=159)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[orc_llap] 
(batchId=169)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[tez_smb_main]
 (batchId=164)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/13570/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/13570/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-13570/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 3 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12938137 - PreCommit-HIVE-Build

> Fix mapjoin size estimations for Fast implementation
> ----------------------------------------------------
>
>                 Key: HIVE-20491
>                 URL: https://issues.apache.org/jira/browse/HIVE-20491
>             Project: Hive
>          Issue Type: Improvement
>          Components: Statistics
>            Reporter: Zoltan Haindrich
>            Assignee: Zoltan Haindrich
>            Priority: Major
>         Attachments: HIVE-20491.01.patch, HIVE-20491.01wip02.patch
>
>
> HIVE-19824 have fixed the estimations; but it calculated for the "optimized" 
> impl; the "fast" one has a little bit bigger footprint.
> It also seems like fast is a bit overestimated at runtime...that should be 
> also taken care of.
> | numkeys | implementation | compiler estimation | runtime estimation | 
> runtime measurement | ce / rm | re / rm |
> | 25M | FAST | 1168435456 | 2189433712 | 1513584984 | .77 | 1.44 |
> | 25M | OPTIMIZED | 1168435456 | 1191203764 | 1168439664 | 100% | 1.01 |



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to