[ 
https://issues.apache.org/jira/browse/HIVE-20762?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16656271#comment-16656271
 ] 

Hive QA commented on HIVE-20762:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12944508/HIVE-20762.02.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 15110 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.llap.security.TestLlapSignerImpl.testSigning 
(batchId=330)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/14559/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/14559/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-14559/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12944508 - PreCommit-HIVE-Build

> NOTIFICATION_LOG cleanup interval is hardcoded as 60s and is too small.
> -----------------------------------------------------------------------
>
>                 Key: HIVE-20762
>                 URL: https://issues.apache.org/jira/browse/HIVE-20762
>             Project: Hive
>          Issue Type: Bug
>          Components: HiveServer2, Metastore
>    Affects Versions: 4.0.0
>            Reporter: Sankar Hariappan
>            Assignee: Sankar Hariappan
>            Priority: Minor
>              Labels: Metastore
>         Attachments: HIVE-20762.01.patch, HIVE-20762.02.patch
>
>
> NOTIFICATION_LOG cleanup interval is hardcoded as 60s and is too small. It 
> should be set to several hours or else the number of metastore calls would be 
> too high and impact other operations.
> Make it configurable item and set it as 2Hrs.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to