[ 
https://issues.apache.org/jira/browse/HIVE-20775?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Jesus Camacho Rodriguez updated HIVE-20775:
-------------------------------------------
       Resolution: Fixed
    Fix Version/s: 4.0.0
           Status: Resolved  (was: Patch Available)

Pushed to master, thanks [~ashutoshc]!

> Factor cost of each SJ reduction when costing a follow-up reduction
> -------------------------------------------------------------------
>
>                 Key: HIVE-20775
>                 URL: https://issues.apache.org/jira/browse/HIVE-20775
>             Project: Hive
>          Issue Type: Bug
>          Components: Physical Optimizer
>            Reporter: Jesus Camacho Rodriguez
>            Assignee: Jesus Camacho Rodriguez
>            Priority: Major
>             Fix For: 4.0.0
>
>         Attachments: HIVE-20775.01.patch, HIVE-20775.02.patch, 
> HIVE-20775.03.patch, HIVE-20775.04.patch, HIVE-20775.05.patch, 
> HIVE-20775.06.patch, HIVE-20775.patch
>
>
> Currently, while costing the SJ in a plan, the stats of the a TS that is 
> reduced by a SJ are not adjusted after we have decided to keep a SJ in the 
> tree. Ideally, we could adjust the stats to take into account decisions that 
> have already been made.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to