[ 
https://issues.apache.org/jira/browse/HIVE-21262?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16767681#comment-16767681
 ] 

Hive QA commented on HIVE-21262:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12958585/HIVE-21262.patch

{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 15772 tests 
executed
*Failed tests:*
{noformat}
TestCliDriver - did not produce a TEST-*.xml file (likely timed out) 
(batchId=30)
        
[autogen_colalias.q,notable_alias3.q,avro_decimal_native.q,vector_acid3.q,nestedvirtual.q,insert_overwrite_local_directory_1.q,correlated_join_keys.q,ppr_pushdown3.q,vector_reduce1.q,groupby2_map.q,tez_vector_dynpart_hashjoin_2.q,rcfile_null_value.q,join24.q,delete_all_partitioned.q,skewjoin_union_remove_2.q,masking_11.q,bucketmapjoin_negative3.q,authorization_cli_createtab.q,cbo_rp_windowing_2.q,insert_non_utf8_encoding_table.q,vector_reduce3.q,fold_when.q,orc_empty_table.q,smb_cache.q,hybridgrace_hashjoin_1.q,union_assertion_type.q,join18_multi_distinct.q,udf_log10.q,exim_19_part_external_location.q,quotedid_smb.q]
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/16061/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/16061/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-16061/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12958585 - PreCommit-HIVE-Build

> Running schemeAuthority.q and schemeAuthority2.q in parallel can cause 
> flakyness
> --------------------------------------------------------------------------------
>
>                 Key: HIVE-21262
>                 URL: https://issues.apache.org/jira/browse/HIVE-21262
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Peter Vary
>            Assignee: Peter Vary
>            Priority: Major
>         Attachments: HIVE-21262.patch
>
>
> Found by our internal ptest runs that if the schemeAuthority.q and the 
> schemeAuthority2.q is ended up in different batches and run parallel by 
> ptest, then the data files are removed after the first one is finished and 
> the second one fails because of the missing data.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to