[ 
https://issues.apache.org/jira/browse/HIVE-21520?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16804059#comment-16804059
 ] 

Hive QA commented on HIVE-21520:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12964005/HIVE-21520.1.patch

{color:red}ERROR:{color} -1 due to no test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 15877 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.llap.metrics.TestReadWriteLockMetrics.testWithContention 
(batchId=330)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/16735/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/16735/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-16735/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 1 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12964005 - PreCommit-HIVE-Build

> Query "Submit plan" time reported is incorrect
> ----------------------------------------------
>
>                 Key: HIVE-21520
>                 URL: https://issues.apache.org/jira/browse/HIVE-21520
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Rajesh Balamohan
>            Priority: Trivial
>         Attachments: HIVE-21520.1.patch
>
>
> Hive master branch + LLAP
> {noformat}
> Query Execution Summary
> ----------------------------------------------------------------------------------------------
> OPERATION                            DURATION
> ----------------------------------------------------------------------------------------------
> Compile Query                           0.00s
> Prepare Plan                            0.00s
> Get Query Coordinator (AM)              0.00s
> Submit Plan                         1553658149.89s
> Start DAG                               0.53s
> Run DAG                                 0.43s
> ----------------------------------------------------------------------------------------------
> {noformat}



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to