[ 
https://issues.apache.org/jira/browse/HIVE-21991?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16890603#comment-16890603
 ] 

Hive QA commented on HIVE-21991:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12975441/HIVE-21991.3.patch

{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 16682 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[orc_merge9] (batchId=29)
org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[orc_merge9] 
(batchId=167)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/18140/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18140/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18140/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12975441 - PreCommit-HIVE-Build

> Upgrade ORC version to 1.5.6
> ----------------------------
>
>                 Key: HIVE-21991
>                 URL: https://issues.apache.org/jira/browse/HIVE-21991
>             Project: Hive
>          Issue Type: Task
>          Components: ORC
>            Reporter: Vineet Garg
>            Assignee: Vineet Garg
>            Priority: Major
>         Attachments: HIVE-21991.1.patch, HIVE-21991.2.patch, 
> HIVE-21991.3.patch
>
>




--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Reply via email to