[ 
https://issues.apache.org/jira/browse/HIVE-22068?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16909557#comment-16909557
 ] 

Hive QA commented on HIVE-22068:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12977811/HIVE-22068.05.patch

{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 16744 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/18360/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18360/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18360/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12977811 - PreCommit-HIVE-Build

> Return the last event id dumped as repl status to avoid notification event 
> missing error.
> -----------------------------------------------------------------------------------------
>
>                 Key: HIVE-22068
>                 URL: https://issues.apache.org/jira/browse/HIVE-22068
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Ashutosh Bapat
>            Assignee: Ashutosh Bapat
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-22068.01.patch, HIVE-22068.02.patch, 
> HIVE-22068.03.patch, HIVE-22068.04.patch, HIVE-22068.05.patch
>
>          Time Spent: 1h 10m
>  Remaining Estimate: 0h
>
> In repl load, update the status of target database to the last event dumped 
> so that repl status returns that and next incremental can specify it as the 
> event from which to start the dump. WIthout that repl status might return and 
> old event which might cause, older events to be dumped again and/or a 
> notification event missing error if the older events are cleaned by the 
> cleaner.
> While at it
>  * Add more logging to DB notification listener cleaner thread
>  ** The time when it considered cleaning, the interval and time before which 
> events were cleared, the min and max id at that time
>  ** how many events were cleared
>  ** min and max id after the cleaning.
>  * In REPL::START document the starting event, end event if specified and the 
> maximum number of events, if specified.
>  *



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Reply via email to